1) If 15 men can built a wall 109 meters long in 7 days, what length of a similar wall can be built by 20 men in 3 days. meters Answer:_______________ |
2) If 12 men can built a wall 118 meters long in 6 days, what length of a similar wall can be built by 17 men in 3 days. meters Answer:_______________ |
3) If 13 men can built a wall 120 meters long in 8 days, what length of a similar wall can be built by 18 men in 2 days. meters Answer:_______________ |
4) If 14 men can built a wall 108 meters long in 7 days, what length of a similar wall can be built by 20 men in 4 days. meters Answer:_______________ |
5) If 14 men can built a wall 102 meters long in 9 days, what length of a similar wall can be built by 17 men in 4 days. meters Answer:_______________ |
6) If 15 men can built a wall 119 meters long in 8 days, what length of a similar wall can be built by 18 men in 2 days. meters Answer:_______________ |
7) If 14 men can built a wall 110 meters long in 9 days, what length of a similar wall can be built by 16 men in 4 days. meters Answer:_______________ |
8) If 14 men can built a wall 115 meters long in 9 days, what length of a similar wall can be built by 17 men in 2 days. meters Answer:_______________ |
9) If 10 men can built a wall 116 meters long in 7 days, what length of a similar wall can be built by 16 men in 2 days. meters Answer:_______________ |
10) If 14 men can built a wall 112 meters long in 7 days, what length of a similar wall can be built by 17 men in 2 days. meters Answer:_______________ |
1) If 15 men can built a wall 109 meters long in 7 days, what length of a similar wall can be built by 20 men in 3 days. Answer: 62 meters SOLUTION 1 : Soln :
Step :1 Consider the No of men & Length of the wall. As the No of men increases from 15 to 20, the length of the wall also increases. It is in direct variation. The multiplying factor = Step :2 Consider the No of days & the length of the wall. As the No of days decreases from 7 to 3, length of the wall also decreases. It is in direct variation. The multiplying factor = x = x x 109 = 1.33333333333 x 0.428571428571 x 109 = 62 meters |
2) If 12 men can built a wall 118 meters long in 6 days, what length of a similar wall can be built by 17 men in 3 days. Answer: 84 meters SOLUTION 1 : Soln :
Step :1 Consider the No of men & Length of the wall. As the No of men increases from 12 to 17, the length of the wall also increases. It is in direct variation. The multiplying factor = Step :2 Consider the No of days & the length of the wall. As the No of days decreases from 6 to 3, length of the wall also decreases. It is in direct variation. The multiplying factor = x = x x 118 = 1.41666666667 x 0.5 x 118 = 84 meters |
3) If 13 men can built a wall 120 meters long in 8 days, what length of a similar wall can be built by 18 men in 2 days. Answer: 42 meters SOLUTION 1 : Soln :
Step :1 Consider the No of men & Length of the wall. As the No of men increases from 13 to 18, the length of the wall also increases. It is in direct variation. The multiplying factor = Step :2 Consider the No of days & the length of the wall. As the No of days decreases from 8 to 2, length of the wall also decreases. It is in direct variation. The multiplying factor = x = x x 120 = 1.38461538462 x 0.25 x 120 = 42 meters |
4) If 14 men can built a wall 108 meters long in 7 days, what length of a similar wall can be built by 20 men in 4 days. Answer: 88 meters SOLUTION 1 : Soln :
Step :1 Consider the No of men & Length of the wall. As the No of men increases from 14 to 20, the length of the wall also increases. It is in direct variation. The multiplying factor = Step :2 Consider the No of days & the length of the wall. As the No of days decreases from 7 to 4, length of the wall also decreases. It is in direct variation. The multiplying factor = x = x x 108 = 1.42857142857 x 0.571428571429 x 108 = 88 meters |
5) If 14 men can built a wall 102 meters long in 9 days, what length of a similar wall can be built by 17 men in 4 days. Answer: 55 meters SOLUTION 1 : Soln :
Step :1 Consider the No of men & Length of the wall. As the No of men increases from 14 to 17, the length of the wall also increases. It is in direct variation. The multiplying factor = Step :2 Consider the No of days & the length of the wall. As the No of days decreases from 9 to 4, length of the wall also decreases. It is in direct variation. The multiplying factor = x = x x 102 = 1.21428571429 x 0.444444444444 x 102 = 55 meters |
6) If 15 men can built a wall 119 meters long in 8 days, what length of a similar wall can be built by 18 men in 2 days. Answer: 36 meters SOLUTION 1 : Soln :
Step :1 Consider the No of men & Length of the wall. As the No of men increases from 15 to 18, the length of the wall also increases. It is in direct variation. The multiplying factor = Step :2 Consider the No of days & the length of the wall. As the No of days decreases from 8 to 2, length of the wall also decreases. It is in direct variation. The multiplying factor = x = x x 119 = 1.2 x 0.25 x 119 = 36 meters |
7) If 14 men can built a wall 110 meters long in 9 days, what length of a similar wall can be built by 16 men in 4 days. Answer: 56 meters SOLUTION 1 : Soln :
Step :1 Consider the No of men & Length of the wall. As the No of men increases from 14 to 16, the length of the wall also increases. It is in direct variation. The multiplying factor = Step :2 Consider the No of days & the length of the wall. As the No of days decreases from 9 to 4, length of the wall also decreases. It is in direct variation. The multiplying factor = x = x x 110 = 1.14285714286 x 0.444444444444 x 110 = 56 meters |
8) If 14 men can built a wall 115 meters long in 9 days, what length of a similar wall can be built by 17 men in 2 days. Answer: 31 meters SOLUTION 1 : Soln :
Step :1 Consider the No of men & Length of the wall. As the No of men increases from 14 to 17, the length of the wall also increases. It is in direct variation. The multiplying factor = Step :2 Consider the No of days & the length of the wall. As the No of days decreases from 9 to 2, length of the wall also decreases. It is in direct variation. The multiplying factor = x = x x 115 = 1.21428571429 x 0.222222222222 x 115 = 31 meters |
9) If 10 men can built a wall 116 meters long in 7 days, what length of a similar wall can be built by 16 men in 2 days. Answer: 53 meters SOLUTION 1 : Soln :
Step :1 Consider the No of men & Length of the wall. As the No of men increases from 10 to 16, the length of the wall also increases. It is in direct variation. The multiplying factor = Step :2 Consider the No of days & the length of the wall. As the No of days decreases from 7 to 2, length of the wall also decreases. It is in direct variation. The multiplying factor = x = x x 116 = 1.6 x 0.285714285714 x 116 = 53 meters |
10) If 14 men can built a wall 112 meters long in 7 days, what length of a similar wall can be built by 17 men in 2 days. Answer: 39 meters SOLUTION 1 : Soln :
Step :1 Consider the No of men & Length of the wall. As the No of men increases from 14 to 17, the length of the wall also increases. It is in direct variation. The multiplying factor = Step :2 Consider the No of days & the length of the wall. As the No of days decreases from 7 to 2, length of the wall also decreases. It is in direct variation. The multiplying factor = x = x x 112 = 1.21428571429 x 0.285714285714 x 112 = 39 meters |