1) If 15 men can built a wall 100 meters long in 7 days, what length of a similar wall can be built by 19 men in 4 days. meters Answer:_______________ |
2) If 10 men can built a wall 114 meters long in 8 days, what length of a similar wall can be built by 19 men in 3 days. meters Answer:_______________ |
3) If 11 men can built a wall 100 meters long in 7 days, what length of a similar wall can be built by 19 men in 3 days. meters Answer:_______________ |
4) If 10 men can built a wall 106 meters long in 9 days, what length of a similar wall can be built by 18 men in 2 days. meters Answer:_______________ |
5) If 14 men can built a wall 104 meters long in 8 days, what length of a similar wall can be built by 18 men in 4 days. meters Answer:_______________ |
6) If 13 men can built a wall 112 meters long in 5 days, what length of a similar wall can be built by 17 men in 2 days. meters Answer:_______________ |
7) If 15 men can built a wall 105 meters long in 6 days, what length of a similar wall can be built by 18 men in 3 days. meters Answer:_______________ |
8) If 14 men can built a wall 103 meters long in 7 days, what length of a similar wall can be built by 18 men in 3 days. meters Answer:_______________ |
9) If 10 men can built a wall 100 meters long in 8 days, what length of a similar wall can be built by 16 men in 3 days. meters Answer:_______________ |
10) If 10 men can built a wall 114 meters long in 6 days, what length of a similar wall can be built by 18 men in 3 days. meters Answer:_______________ |
1) If 15 men can built a wall 100 meters long in 7 days, what length of a similar wall can be built by 19 men in 4 days. Answer: 72 meters SOLUTION 1 : Soln :
Step :1 Consider the No of men & Length of the wall. As the No of men increases from 15 to 19, the length of the wall also increases. It is in direct variation. The multiplying factor = Step :2 Consider the No of days & the length of the wall. As the No of days decreases from 7 to 4, length of the wall also decreases. It is in direct variation. The multiplying factor = x = x x 100 = 1.26666666667 x 0.571428571429 x 100 = 72 meters |
2) If 10 men can built a wall 114 meters long in 8 days, what length of a similar wall can be built by 19 men in 3 days. Answer: 81 meters SOLUTION 1 : Soln :
Step :1 Consider the No of men & Length of the wall. As the No of men increases from 10 to 19, the length of the wall also increases. It is in direct variation. The multiplying factor = Step :2 Consider the No of days & the length of the wall. As the No of days decreases from 8 to 3, length of the wall also decreases. It is in direct variation. The multiplying factor = x = x x 114 = 1.9 x 0.375 x 114 = 81 meters |
3) If 11 men can built a wall 100 meters long in 7 days, what length of a similar wall can be built by 19 men in 3 days. Answer: 74 meters SOLUTION 1 : Soln :
Step :1 Consider the No of men & Length of the wall. As the No of men increases from 11 to 19, the length of the wall also increases. It is in direct variation. The multiplying factor = Step :2 Consider the No of days & the length of the wall. As the No of days decreases from 7 to 3, length of the wall also decreases. It is in direct variation. The multiplying factor = x = x x 100 = 1.72727272727 x 0.428571428571 x 100 = 74 meters |
4) If 10 men can built a wall 106 meters long in 9 days, what length of a similar wall can be built by 18 men in 2 days. Answer: 42 meters SOLUTION 1 : Soln :
Step :1 Consider the No of men & Length of the wall. As the No of men increases from 10 to 18, the length of the wall also increases. It is in direct variation. The multiplying factor = Step :2 Consider the No of days & the length of the wall. As the No of days decreases from 9 to 2, length of the wall also decreases. It is in direct variation. The multiplying factor = x = x x 106 = 1.8 x 0.222222222222 x 106 = 42 meters |
5) If 14 men can built a wall 104 meters long in 8 days, what length of a similar wall can be built by 18 men in 4 days. Answer: 67 meters SOLUTION 1 : Soln :
Step :1 Consider the No of men & Length of the wall. As the No of men increases from 14 to 18, the length of the wall also increases. It is in direct variation. The multiplying factor = Step :2 Consider the No of days & the length of the wall. As the No of days decreases from 8 to 4, length of the wall also decreases. It is in direct variation. The multiplying factor = x = x x 104 = 1.28571428571 x 0.5 x 104 = 67 meters |
6) If 13 men can built a wall 112 meters long in 5 days, what length of a similar wall can be built by 17 men in 2 days. Answer: 59 meters SOLUTION 1 : Soln :
Step :1 Consider the No of men & Length of the wall. As the No of men increases from 13 to 17, the length of the wall also increases. It is in direct variation. The multiplying factor = Step :2 Consider the No of days & the length of the wall. As the No of days decreases from 5 to 2, length of the wall also decreases. It is in direct variation. The multiplying factor = x = x x 112 = 1.30769230769 x 0.4 x 112 = 59 meters |
7) If 15 men can built a wall 105 meters long in 6 days, what length of a similar wall can be built by 18 men in 3 days. Answer: 63 meters SOLUTION 1 : Soln :
Step :1 Consider the No of men & Length of the wall. As the No of men increases from 15 to 18, the length of the wall also increases. It is in direct variation. The multiplying factor = Step :2 Consider the No of days & the length of the wall. As the No of days decreases from 6 to 3, length of the wall also decreases. It is in direct variation. The multiplying factor = x = x x 105 = 1.2 x 0.5 x 105 = 63 meters |
8) If 14 men can built a wall 103 meters long in 7 days, what length of a similar wall can be built by 18 men in 3 days. Answer: 57 meters SOLUTION 1 : Soln :
Step :1 Consider the No of men & Length of the wall. As the No of men increases from 14 to 18, the length of the wall also increases. It is in direct variation. The multiplying factor = Step :2 Consider the No of days & the length of the wall. As the No of days decreases from 7 to 3, length of the wall also decreases. It is in direct variation. The multiplying factor = x = x x 103 = 1.28571428571 x 0.428571428571 x 103 = 57 meters |
9) If 10 men can built a wall 100 meters long in 8 days, what length of a similar wall can be built by 16 men in 3 days. Answer: 60 meters SOLUTION 1 : Soln :
Step :1 Consider the No of men & Length of the wall. As the No of men increases from 10 to 16, the length of the wall also increases. It is in direct variation. The multiplying factor = Step :2 Consider the No of days & the length of the wall. As the No of days decreases from 8 to 3, length of the wall also decreases. It is in direct variation. The multiplying factor = x = x x 100 = 1.6 x 0.375 x 100 = 60 meters |
10) If 10 men can built a wall 114 meters long in 6 days, what length of a similar wall can be built by 18 men in 3 days. Answer: 103 meters SOLUTION 1 : Soln :
Step :1 Consider the No of men & Length of the wall. As the No of men increases from 10 to 18, the length of the wall also increases. It is in direct variation. The multiplying factor = Step :2 Consider the No of days & the length of the wall. As the No of days decreases from 6 to 3, length of the wall also decreases. It is in direct variation. The multiplying factor = x = x x 114 = 1.8 x 0.5 x 114 = 103 meters |